In all construction zones, motorists are asked to reduce speed, obey posted signs, and use extreme caution, as well as continue to be cautious of heavy equipment and construction personnel in the area. PLEASE NOTE: Conditions are subject to change without notice. Double fines for speeding in work zones may be in effect.
White Sands Missile Range Notification
For information regarding closures, you may call WSMR at 678-1178 or 678-2222 for updates.
Interstates:
I-25 Business Loop Roadway Rehabilitation Project, Williamsburg to T or C
Mountain States Constructors, Inc. (Contractor) will be completing operations in T or C on Date, Broadway and Main Streets. Drivers can expect lane closures from the roundabout working towards Interstate Exit 75 (Williamsburg). Possible overnight closures may be in place if paving operations are not completed from the day. One lane of traffic will remain open throughout the duration and access to all businesses and residences will be maintained during construction, some areas may require a detour. Work hours will be from 7 a.m. to 5:30 p.m., Monday through Friday.
I-10 Roadway Rehabilitation Project, Mile Marker 64 to 75, Deming CN1101890
Mountain States Constructors, Inc. (Contractor) will be continuing a roadway rehabilitation project on Interstate 10 from milepost 64 (Gage) to milepost 75 (just west of Deming) in Luna County. Drivers can expect various daytime lane closures on both the eastbound and westbound lanes as needed for milling and paving operations. A 12' width restriction is in place throughout the project, overside loads will need to be permitted. Overnight lane closure may be in place for the placement of the concrete wall barrier and guardrail installations. Areas of construction may be heavily congested. The contractor's hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
I-10 Roadway Resurfacing Project, Mile Marker 146 to 164.3, Las Cruces to Anthony
Brasier Asphalt Inc., (Contractor), this project is now in winter suspension until Spring 2025. All lanes open.
I-10 Bridge & Roadway Rehabilitation Project, Mile Marker 140 to 143, Las Cruces CNLC00371
La Calerita Construction, LLC. (Contractor) will be continuing a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project includes bridge rehabilitation, roadway reconstruction and lighting. Traffic has been shifted into the westbound lanes with the eastbound lanes closed for bridge construction. There will be no access to the eastbound on/off ramps and due to restricted areas the westbound on ramp will be closed for the duration of the traffic switch. The speed limit has been reduced to 45 MPH throughout the project. The contractor's working hours are Monday through Friday from 7 a.m. to 5 p.m.
US Roadways:
US 70 Roadway Rehabilitation, Mile Marker 149 to 150 Las Cruces LC00271
El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. All traffic has been placed on the new eastbound lanes of US 70 (2 lanes open eastbound and 1 lane open westbound) and the existing westbound lanes will be closed for construction. The closure of El Camino Real at US 70/North Main Street has been extended, with El Camino Real scheduled to reopen sometime during the week of February 24-28, 2025. The speed limit is reduced to 35 miles per hour throughout the construction zone. For the safety of the traveling public, the Alameda Arroyo trail crossing remains CLOSED. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. Access will be maintained to all businesses and residences during construction. For more information or to sign up for construction updates, visit www.us70mainstreet.com.
US 70 Roadway Rehabilitation, Mile Marker 162 to 150, Las CrucesLC00440
Mesa Verde Enterprises, Inc. (Contractor) US 70 from MP 153 to 161 (Mesa Grande to town of Organ) is now in winter suspension, all lanes are open.
US 180 Roadway Reconstruction Project, Mile Marker 123 to 128, Hurley, CN#1101841
Mountain States Constructors, Inc., (Contractor) will be continuing with the roadway reconstruction project along US 180 from 123.13 in Bayard to milepost 128.27 in Hurley. The detour at the railroad tracks is now in operation. Drivers should anticipate daytime lane closures in both the eastbound and westbound lanes as necessary. A flagging operation will be in place with up to a 15-minute wait time. Please be aware that Lime Quarry Rd has a new traffic pattern in place, caution is advised as you travel through the area. The contractor's working hours are Monday through Friday from 7 a.m. to 5 p.m. This reconstruction project is expected to take just over a year to complete, depending on weather conditions. Speed limits are reduced throughout the project to 45 mph, this project is a double fine zone.
State Roadways:
NM 101, University Ave Multimodal Project, Mesilla LC00290
La Calerita Construction, LLC. (Contractor) will be continuing the multi-modal project on University Avenue/New Mexico State Road 101 from Avenida de Mesilla to South Main Street. The roadway near the Laguna Lateral will be closed for the removal and reconstruction of the concrete box. A detour will redirect traffic from Avenida de Mesilla, W Union Ave, to McDowell Place. Drivers can expect various daytime lane closures near the intersection of Avenida de Mesilla and University Ave replacing the old sidewalk adding in ADA ramps and removing fencing throughout the project. The contractor's hours of operation will be from 7 a.m. to 5:30 p.m., Monday through Friday.
Chip Seal Projects, Hidalgo & Grant Co:
The New Mexico Department of Transportation (NMDOT) "Fog Sealing and Brooming" operations will continue in Hidalgo Co. as soon as temperatures allow. Speed limits will remain reduced. NM 81 & NM 146 are scheduled to be sealed and striped as soon as temperatures allow.
City of Las Cruces Projects:
Casa Linda Acres Subdivision
As part of the Casa Linda Acres Reconstruction Project, Spartan Construction of NM, LLC, will be maintaining road closures on Avenida Blanco from South Valley Drive to Calle Del Encanto, and on Calle Del Sol from Avenida de Mesilla to West Brown Road. Closures will be implemented through June 28, 2025. Access will be maintained for residents; motorists are urged to follow all posted signs.
East Mesa Roads & Drainage - Cortez Drive Improvements
As part of the Cortez Drive Improvements, roadway, storm drainage, and utility improvements will be conducted by Caliper Construction (Contractor) on Cortez Drive between Porter Drive and Dunn Drive. Cortez will be closed to through traffic. Detours will be in place directing traffic around the road closure. Access will be maintained for residents; motorists are urged to follow all posted signs. The entire project is estimated to be completed by December 2025.
TXDOT I-10 Project Traffic Alert:
WEST AREA OFFICE PROJECTS
I-10 Widening West
Sunday, February 23, through Thursday, February 27, 9 p.m. to 5 a.m.
• South Desert Boulevard will be closed south of Redd Road.
DETOUR: Turn right on Redd Road, left on Doniphan, left on Thorn Avenue.
Crews will be constructing a retaining wall.
Monday, February 24, through Saturday, March 1, 9 a.m. to 4 p.m.
• I-10 East and West will be alternatingly reduced to one lane between Vinton Road and Transmountain Road.
Crews will be hauling dirt.
Monday, February 24, through Saturday, March 1, 9 a.m. to 4 p.m.
• I-10 East and West will be alternatingly reduced to one lane between Mesa Street and Redd Road.
Crews will be hauling dirt.
Monday, February 24, through Tuesday, February 25, 9 p.m. to 5 a.m.
• I-10 West will be closed at Artcraft Road.
DETOUR: Take Exit 8 (SH 178/Artcraft Road), continue on North Desert, and re-enter I-10 West past Vinton Road.
Crews will be relocating barriers.
Monday, February 24, through Saturday, March 1, 9 a.m. to 4 p.m.
• Redd Road East and West will be alternatingly reduced to one lane at South Desert Boulevard and North Desert Boulevard.
Crews will be conducting electrical work.
Wednesday, February 26, and Thursday, February 27, 9 p.m. to 5 a.m.
• I-10 East will be closed at Los Mochis Drive.
• DETOUR: Continue on South Desert Boulevard, and re-enter I-10 East past Artcraft.
Crews will be relocating barriers.
49-HOUR CLOSURE
Saturday, March 1 at 4 a.m., through Monday, March 3 at 5 a.m.
• I-10 East will be closed at Vinton Road.
DETOUR: Take Exit 2 (Spur 37/Vinton Road/Westway Drive), turn right on Vinton Road, left on Doniphan, left on Talbot Avenue, right on South Desert, and re-enter I-10 East past Artcraft.
• I-10 West closed at Transmountain Road.
DETOUR: Take Exit 6A (Loop 375/Transmountain Road), continue on North Desert, and re-enter I-10 West past Vinton Road.
• South Desert Boulevard will be closed at Los Mochis Drive.
Crews will be opening the I-10 mainlanes.
I-10 Widening West 2
Alternating Lane Closures
Monday, February 24 through Saturday, March 1, 9 a.m. to 4 p.m. Daily
● Alternating lane closures on I-10 East and I-10 West from Anthony, TX to Nashua Road
● Alternating lane closures on North Desert Boulevard and South Desert Boulevard from Anthony, TX to Nashua Road
Crews will be performing dirt work and removing miscellaneous materials
Long Term Closure
Through Spring 2026
● Complete closure at Valley Chile Road Turnaround
DETOUR: Southbound traffic will continue on South Desert Boulevard to Vinton Road, make a left on Vinton Road, and make another left onto North Desert Boulevard. Northbound traffic will continue on North Desert Boulevard to Antonio Street, make a left on Antonio Street, and make another left onto South Desert Boulevard.
Crews will be reconstructing and widening the bridge at Valle Chile Road
TXDOT Roadway Closures can be found at www.drivetexas.com.